productive pricing

Productive.io Pricing Plans: Is Productive Worth It in 2026?

Last Updated: March 29, 2026
21 min read

Article By
Namira Taif

38b0e88e 5dee 415a a1e3 f8b81512e52f

Reviewed by
Mohammod Munir

Agency Handy Color Logo

Manage clients, projects, invoices, and payments in one platform. No more back and forth.

Agency Handy Color Logo

Run your video editing business like a pro. Projects, clients, payments—all in one place.

Productive.io offers a comprehensive agency management solution with 4 flexible pricing tiers (e.g. based on a single user) designed to meet the needs of agencies of all sizes:

  • Essential: $11/month (billed monthly) or $9/month (billed annually) for core project management tools.
  • Professional: $28/month (billed monthly) or $24/month (billed annually) with added features like advanced reporting and resource planning.
  • Ultimate: Custom pricing tailored for agencies needing more support and customization options.
  • Enterprise: Custom pricing for agencies with 50+ users, offering the highest level of support and features.

In this article, we’ll get into each plan, exploring the features and benefits they provide. This will help you determine which option best aligns with your agency’s needs and goals.

Key Takeaways

  • Productive is ideal for agencies needing advanced management tools and customizable workflows. It’s best for larger teams and complex operations.
  • Productive offers four pricing tiers: Essential, Professional, Ultimate, and Enterprise. Each plan caters to different agency sizes and needs.
  • Alternatives like Agency Handy, Scoro, and Accelo offer similar and go beyond that. Choose based on your specific agency needs.

What is Productive.io?

Productive.io is an all-in-one agency management platform to centralize your project, resource, and financial management. By combining these essential tools, it helps you streamline your operations, work more efficiently, and boost your profitability.

Productive.io HomePage

With Productive.io, you can access a wide range of features that support all aspects of your agency’s work. You’ll find flexible project management views, real-time team collaboration, and accurate time tracking. 

These tools simplify your workflows and give you a complete picture of what’s happening in your agency. This means you can make informed decisions that drive your agency’s growth.

The platform integrates with popular tools like Xero, Slack, and Google Calendar, making it versatile and adaptable. With Productive.io, agencies can focus on growth while maintaining control over every aspect of their operations. 

Productive.io Pricing Plans: A Quick Look

Productive.io offers 4 pricing tiers to suit different agency needs. The pricing is determined per user, so the overall cost rises as more users are added. 

Productive.io Pricing

Here’s a quick comparison of the key features across the different pricing plans:

Feature

Essential

Professional 

Ultimate 

Enterprise

Cost (Annually)

$9/month

$24/month

Custom Pricing

Custom Pricing

Time Tracking

Task dependencies

Repeating tasks

Automation

Automation Runs

100

1000

5000

5000

Recycle Bin Retention

7 days

180 days

2 years

2 years

Sales & Budgeting

Expense approvals

Resource scheduling

Remove branding

Zapier integration

Reports Library

Teams

5

20

Custom

Task Workflows

2

5

10

Custom

Custom fields

5

15

Custom

Custom fields per project

3

10

Custom

Scheduling placeholders

5

10

Custom

Rate cards

10

30

Custom

Sync time off from the HR tool

Addon ($2 per seat)

Addon ($2 per seat)

Addon ($2 per seat)

Addon ($2 per seat)

Note: A 14-day free trial is available, with no credit card required, and you can cancel anytime.

How is Productive.io’s Cost Calculated?

Productive.io calculates its cost based on several key factors:

  1. Plan Tier: Productive.io offers four pricing tiers: Essential, Professional, Ultimate, and Enterprise. The Essential plan starts at $9 per month (billed annually), while the higher tiers have more advanced features and custom pricing.
  2. Team Size: The cost is influenced by the number of users in your team. It begins with single-user pricing. As the number goes up, the pricing will do similarly. 
  3. Additional Features: Higher tiers like Ultimate and Enterprise include advanced features such as custom fields, automatic time tracking, and improved security options like Two-Factor Authentication, which can impact the overall cost.
  4. Custom Add-ons: Certain features, like syncing time off from an HR tool, can be added for an extra $2 per seat per month. These add-ons allow you to customize your plan according to your specific needs.

In general, the cost of Productive.io increases with the number of users, the choice of plan, and the need for additional features or custom add-ons. Each plan is designed to scale with your agency’s needs, ensuring you only pay for what you use.

Productive.io Pricing: A Complete Breakdown of Each Plan

Well, you have a quick understanding of what Productive.io offers across its pricing tiers. However, to make a well-informed decision, you’ll have to dive into details. Let’s get into those. 

Productive.io Essential Plan

The Essential tier of Productive.io is tailored for small teams. It offers essential tools without the complexity of higher-tier plans. 

Priced at $9 per month when billed annually, this plan offers a solid foundation for managing your projects, tasks, and time.

Starting with project management, the tier provides multiple views like task boards and lists, allowing you to organize your workflow effectively. You can assign tasks, track time directly within them, and set time estimates to keep your team on schedule.

Productive.io Gantt

You can plan how your team is utilized across projects. This ensures that everyone is available in real-time, avoiding overbooking or idleness.

Plus, regarding tracking time, you can do so via the web, desktop, or mobile app. If anyone forgets to log their time, they can manually add it later with notes to explain what they worked on or missed.

Regarding sales and budgeting, the plan offers simple tools to manage deals, track budgets, and monitor expenses. While it doesn’t provide advanced financial forecasting, it covers the essentials to keep your projects profitable.

Lastly, you can create and send invoices, track payments, and manage retainer invoicing. However, branding customization isn’t included in this plan.

Features of the Essential Plan

The Essential tier is the starting plan designed for small teams or agencies seeking core project management tools:

  • Client Management: Manage client-related tasks within projects efficiently. Ideal for tracking progress without advanced tools.
  • Team Members: Allows access for a small team, perfect for startups. Assign tasks and monitor each member’s contributions.
  • Project Management: Offers task boards and lists to organize tasks. Set time estimates and track progress easily.
  • Time Tracking: Track time via web, desktop, or mobile app. Use manual logging or a timer for accurate timekeeping.
  • Resource Scheduling: Plan team utilization and forecast availability. Keep your team coordinated with basic scheduling tools.
  • Invoicing: Create and send invoices, track payments, and manage retainers. Custom branding isn’t available in this tier.
  • Integrations: Integrate with Google Calendar and Slack for seamless workflow. Simplifies communication and task management.

Pros of the Essential Plan

  • Affordable for small teams and startups with basic needs.
  • Includes key project management features like task boards.
  • Simple time tracking across web, desktop, and mobile platforms.
  • Basic resource scheduling helps maintain balanced workloads.
  • Integrates with Google Calendar and Slack for smooth workflow.
  • Supports invoicing and payment tracking for project finances.

Drawbacks of the Essential Plan

  • No opportunities to add custom fields
  • Purchase orders and retainer management aren’t available. 
  • No access to advanced financial forecasting or detailed reports.

Productive.io Professional Plan

Priced at $24 per month (billed annually), the Professional plan includes everything of the Essential plan and offers more advanced tools for agencies. 

It’s suitable for mid-level project management and operational tools beyond the basics. , it’s ideal for teams needing enhanced control, customization, and scalability.

In this plan, you can add custom fields within tasks and projects. It allows you and your team to customize workflow to specific needs, providing more detailed tracking and organization than the Essential plan.

Productive.io Custom Fields

In addition to customization, the plan improves integration facilities by offering Zapier access to over 1,000 apps. It optimizes your workflows and automates tasks across platforms. 

And for sales and budgeting, you can enjoy features like rate cards (10), enable/disable time tracking function, and retainer management. On top of that, you can give clients access to check the expenses of budgets. 

Resource scheduling also has an upgrade in this tier from the Essential plan. You’ll get additional features, like live reports, placeholders, time off approvals, and data filtration. 

Productive.io Resource Scheduling

Time tracking receives an upgrade with advanced tracking methods, including automatic time tracking and approvals. These features ensure accuracy and compliance in reporting.

Resource scheduling is further improved with live reports, placeholders, time off approvals, and data filtration, helping agencies plan future tasks more effectively. This ensures that resources are managed and available when needed.

Finally, the Reporting feature is significantly enhanced, allowing you to create customizable reports with real-time insights. These advanced reporting tools enable deeper analysis, helping agencies optimize their operations and make informed decisions.

These tools help agencies better plan for future tasks, ensuring that resources are effectively managed and available when needed. 

Features of the Professional Plan

The Professional plan expands on the Essential tier, offering more advanced tools for agencies. Here’s a look at its features:

Everything included in the Essential plan plus:

  • Task Dependencies: Set dependencies between tasks to manage complex projects. This feature ensures tasks are completed in the correct order.
  • Repeating Tasks: Automate recurring tasks to save time on routine work. Perfect for teams handling ongoing projects with repetitive elements.
  • Advanced Reporting: Create customizable reports with real-time insights. Dive deeper into your data to make informed decisions and optimize operations.
  • Rate Cards: Set custom rate cards for different services and clients. It helps to maintain consistent and accurate billing across projects.
  • Expense Approvals: Implement an approval process for expenses to control costs. Ensures that all expenses are reviewed and approved before being billed.
  • Enhanced Resource Scheduling: Plan team utilization with advanced forecasting tools. Manage availability and workload to prevent overbooking or underutilization.
  • Custom Fields: Add custom fields to projects and tasks for more detailed tracking. This feature allows you to tailor the platform to your specific workflow needs.
  • Zapier Integration: Integrate with Zapier to connect with over 1,000 apps. Automate workflows by linking Productive.io with your favorite tools.

Pros of the Professional Plan

  • Includes task dependencies for managing complex project workflows.
  • Offers customizable, real-time reports for better decision-making.
  • Advanced resource scheduling helps prevent overbooking or underutilization.
  • Expense approvals ensure all costs are reviewed and controlled.
  • Custom fields allow detailed tracking tailored to your needs.

Drawback of the Professional Plan 

  • Lacks some advanced features available in the Ultimate tier.
  • May be too complex for very small teams or freelancers.
  • Customization options are limited compared to higher-tier plans.

Productive.io Ultimate Plan 

Likewise, the Ultimate tier also brings more features than the Professional plan and adds more to it. It’s designed for larger teams or agencies managing multiple, complex projects simultaneously.

The Ultimate plan significantly enhances customization options, allowing agencies to add up to 15 custom fields compared to the 5 in the Professional plan. Additionally, you can now include 10 custom fields per project, an upgrade from the 3 fields available in the Professional tier. 

In addition to what you have in the Professional plan, in terms of sales and budgeting, the Ultimate plan lets you forecast financial budgets, and expense approvals, and keep track of purchase orders. 

Productive.io Expense Approval

However, for resource scheduling, there isn’t any significant difference between the Professional and Ultimate plans. You’ll just get 10 scheduling placeholders (5 in the Professional). 

Similarly, the plan allows you to schedule reports in email and Slack, which you didn’t get in the Professional. The other features are the same for both plans.  

Productive.io Slack

But interestingly, you can remove branding and customize the invoices in this plan. This is a step up for white-label branding.

Lastly, if you manage a remote team, this automatic time tracking will be a big savior. No need for manual start or stop hassle. You can also lock time so that no one can add or edit anything on the timesheet.

Features of the Ultimate Plan

The Ultimate plan is Productive.io’s advanced tier plan, offering full customization. Here’s a look at its features:

Everything included in the Professional plan plus:

  • Advanced Task Workflows: Customize and automate complex project workflows. Ideal for agencies managing large-scale projects with intricate dependencies.
  • Custom Fields: Add unlimited custom fields to tasks and projects. Tailor the platform to match your specific workflow and tracking needs.
  • Financial Forecasting: Gain detailed insights into budget projections and profitability. Helps in making informed financial decisions for each project.
  • Expense Approvals: Implement a more rigorous approval process for expenses. Ensures tighter control over project costs and financial management.
  • Custom Rate Cards: Set up custom rate cards for various services and clients. Provides flexibility in pricing and ensures accurate billing.
  • Advanced Resource Scheduling: Utilize custom placeholders and detailed forecasting. Efficiently allocate resources and manage team availability.
  • Enhanced Reporting: Access advanced reporting features like multigrouping and formula fields. Create detailed, customized reports for deeper operational insights.
  • Remove Branding: Customize your invoicing and client communications. Present a fully branded experience to your clients, tailored to your agency.
  • Webhooks: Integrate Productive.io with custom workflows. Automate tasks and connect with external tools seamlessly.

Pros of the Ultimate Plan

  • Full customization of task workflows for complex projects.
  • Unlimited custom fields tailored to your agency’s needs.
  • Detailed financial forecasting for accurate budget planning.
  • Rigorous expense approvals ensure tight cost control.
  • Custom rate cards for flexible and precise billing.
  • Advanced resource scheduling prevents overbooking and underutilization.

Drawbacks of the Ultimate Plan

  • Custom pricing can make budgeting unpredictable for some agencies.
  • Extensive features may be overwhelming for smaller or less complex teams.
  • Requires dedicated time and resources to fully utilize advanced capabilities.

Productive.io Enterprise Plan 

The Enterprise tier of Productive.io is designed to meet the needs of large agencies or organizations with over 50 users. If your agency handles multiple complex operations and requires extensive customization, this plan is made for you.

In the Ultimate plan, you’re limited to 15 custom fields and 10 custom fields per project. But with the Enterprise plan, these limits are removed entirely, giving you unlimited custom fields for tracking diverse and complex data. This flexibility is essential for large agencies that need to monitor various data points effectively.

When it comes to managing teams, the Ultimate plan allows up to 20 teams with 10 customizable task workflows. The Enterprise plan takes this further by offering unlimited team structures and workflows. 

Resource management is another area in which the Enterprise plan shines. While the Ultimate plan includes up to 10 scheduling placeholders, the Enterprise plan provides customizable placeholders with no limits.

Reporting features are also enhanced in the Enterprise plan. While the Ultimate plan offers advanced reporting with multigrouping, formula fields, and scheduled reports, the Enterprise plan allows for unlimited custom reports with fully customizable fields. 

Support and onboarding are key benefits of the Enterprise plan. Unlike the Ultimate plan, the Enterprise tier provides dedicated onboarding specialists and support teams. This personalized assistance helps you get the most out of Productive.io from day one, reducing the learning curve and ensuring that your agency fully leverages all features.

Security is also a top priority with the Enterprise plan. Enhanced security features like Single Sign-On (SSO) and advanced access controls protect your agency’s sensitive information, providing peace of mind.

Finally, the Enterprise plan offers unlimited rate cards and custom financial forecasting, compared to 30 rate cards in the Ultimate plan. This allows you to create precise and adaptable financial strategies that are crucial for large agencies managing complex budgets.

Features of the Enterprise Plan

The Enterprise plan is Productive.io’s most comprehensive tier, designed for large agencies. Here’s an overview of its key features:

Everything included in the Ultimate plan plus:

  • Dedicated Support: Receive exclusive access to dedicated support teams. Ensures quick resolution of issues and personalized assistance.
  • Custom Onboarding: Benefit from personalized onboarding specialists. Streamlines the implementation process, reducing downtime.
  • Advanced Collaboration Tools: Enhance collaboration across large teams and departments. Ideal for managing complex, multi-team projects.
  • Comprehensive Resource Management: Utilize advanced scheduling tools with custom placeholders. Efficiently allocate resources across multiple projects.
  • Detailed Utilization Reports: Access in-depth reports on resource utilization. Helps in optimizing team performance and project efficiency.

Pros of the Enterprise Plan

  • Custom onboarding ensures smooth implementation and quick productivity.
  • Advanced collaboration tools improve communication across large teams.
  • Comprehensive data security safeguards sensitive information and compliance.
  • Scalable features support growing agencies with tailored solutions.
  • Detailed utilization reports help optimize resources and team efficiency.

Drawbacks of the Enterprise Plan

  • The complexity of features requires dedicated training and onboarding.

Does Productive.io Have Hidden Cost?         

Productive.io’s pricing is generally clear, but there are some extra costs to keep in mind depending on your needs. For example, if you want to sync time off from an HR tool, there’s an additional charge of $2 per seat per month. This can add up, especially if you have a large team.

If you prefer paying by invoice through a wire transfer, this option is available. However, it’s limited to annual subscriptions with at least 10 user seats. This might be a consideration if your team is smaller or if you’re exploring different payment methods.

Beyond Productive.io’s predictable add-on structure, Moxo pricing shows how payment integrations come with layered costs. Credit card fees on top of subscription pricing can reshape the overall expense, especially if your business runs on high transaction volume.

Does Productive.io Offer a Free Trial?

Yes, Productive.io offers a free 14-day trial for all its pricing tiers. This trial gives you full access to the platform’s features, allowing you to explore the tools and capabilities that best fit your agency’s needs. 

No credit card is required to sign up, and you can cancel anytime during the trial period. This allows you to test the platform risk-free and determine if it’s the right solution for your agency before committing to a paid plan.

Is Productive.io Worth The Price?

Productive.io can be a great investment, especially if your agency has specific needs. Here’s when it’s worth considering:

  • Complex Project Management: Ideal for agencies handling intricate projects that require advanced management tools.
  • Custom Workflows and Reporting: Offers detailed financial reports, custom workflows, and extensive resource scheduling.
  • Scalability: Perfect for large or growing teams that need a platform that can scale with their operations.
  • Customization: Suited for agencies that prioritize adaptability and need a solution tailored to their specific needs.

However, consider the following:

  • Smaller Agencies: If you have straightforward needs, the higher-tier plans might offer more than necessary, and a budget-friendly option could be more practical.
  • Learning Curve: The advanced features might have a steep learning curve, which could be challenging for some users.
  • Cost Consideration: The per-user pricing can quickly add up, making it less affordable for growing teams.

In such cases, alternatives like Agency Handy or Scoro might offer similar capabilities without the extra costs associated with Productive.io’s higher-tier plans.

Top 3 Productive Alternatives & Budget Friendly Choices

If you’re exploring alternatives to Productive.io, here are three top tools that offer unique features and capabilities worth considering.

Feature

Productive.io

Agency Handy

Scoro

Accelo

Free Trial

14 days

7 days

14 days

7 days

Average Cost per User (Billed Annually)

$17/month

$32/month

Contact Accelo

Order Management

Yes

Yes

Yes

Yes

Service Listing & Customization

No

Yes, includes a service catalog

Yes, with predefined services

No

Invoicing Subscription Management

Yes

Yes

Yes

Yes

Max Number of Users in Starter Plan

Unlimited

3

Unlimited

3

This was a quick comparison of the main alternatives to Productive.io. Let’s look into more in-depth details that will help you decide which option fits you best. 

Productive.io vs Agency Handy

When choosing between Productive.io and Agency Handy, it’s important to align their features with your agency’s specific needs.

Agency Handy excels in client onboarding with its customizable service catalogs and flexible client portal pricing. This makes it ideal for agencies needing a straightforward and efficient approach to managing client interactions.

While Productive.io offers advanced client management features like direct feedback within the platform, which enhances transparency and communication, it may not be as streamlined as Agency Handy for agencies focused primarily on onboarding.

Agency Handy provides a focused approach to task management, offering built-in tools within its collaboration suite, including Kanban boards for visual task tracking. This ensures that tasks are clearly assigned and managed within customized team workspaces. 

Productive.io Task Management

In terms of resource management, Agency Handy emphasizes team collaboration with straightforward task assignments and workspace customization. This approach helps keep teams organized without the complexity of extensive resource management tools. 

Productive.io offers comprehensive resource scheduling features. These tools enable agencies to forecast availability and manage workloads effectively.

While Productive.io’s detailed tools benefit larger teams, Agency Handy’s simpler resource management is sufficient for smaller teams. It keeps them organized without requiring advanced planning.

Agency Handy excels in financial management with its automated invoicing features that allow for customizable branding and split payments. This flexibility is particularly useful for agencies that manage multiple clients with varied billing needs. 

According to user reviews, agencies appreciate the ability to tailor invoices and handle different payment structures. On the contrary, Productive.io offers more complex financial tools, including multi-currency invoicing, real-time budget tracking, and detailed financial reports.

Agency Handy Invoices

Agency Handy’s collaboration tools, including Kanban boards and file sharing, are designed to enhance teamwork. They are especially effective for agencies with multiple teams working on different projects. These tools provide a straightforward way for teams to stay aligned and share resources effectively. 

While Productive.io also supports real-time collaboration with document and task management, Agency Handy’s focus on simple, yet effective, collaboration features is more suited for agencies that prioritize ease of use and team coordination.

Agency Handy Order Management

Productive.io is ideal for larger teams needing comprehensive management tools, while Agency Handy suits digital agencies focused on team collaboration and efficient client onboarding.

Productive.io vs Scoro

When you look at Productive.io and Scoro, each platform offers unique strengths tailored to different needs.

Productive.io’s project management is built for flexibility. It provides various task views like Kanban boards and timelines, making it a good choice for teams needing adaptable workflows.

Scoro, on the other hand, is designed for agencies handling long-term projects. It includes advanced tools like Gantt charts and milestone tracking, which are essential for detailed planning.

Productive.io shines in time tracking and invoicing. Its integrated tools ensure precise tracking, and its multi-currency invoicing gives you strong financial control across all projects.

Scoro takes financial management a step further with automated billing and advanced cost management. It’s particularly useful for agencies requiring comprehensive financial oversight, especially with complex billing needs.

The collaboration tools also set these platforms apart. Productive.io focuses on real-time collaboration, using AI-powered tools to enhance team communication and document management.

Scoro, however, excels in resource planning. Its advanced features help balance workloads, making it a strong option for agencies focused on efficient resource allocation and forecasting.

If your agency needs flexible project management and solid financial tracking across various tasks, Productive.io might be the right fit. 

But if your work involves long-term, complex projects that demand advanced project management and financial tools, Scoro could be the better choice.

Productive.io vs Accelo 

Choosing between Productive.io and Accelo depends on what your agency needs most.

Productive.io offers flexibility in project management. With various task views like Kanban boards and timelines, it’s perfect for teams that need to customize workflows to match their specific needs.

Accelo, on the other hand, is tailored for agencies focused on client work management. It comes with specialized tools like automated time logging and project scheduling, making it a great choice for service-based agencies.

When it comes to financial management, Productive.io provides detailed time tracking and invoicing, including multi-currency support. This ensures accurate financial oversight across all your projects. Accelo, however, shines with smart task scheduling and flexible billing options, which are ideal for agencies handling diverse client billing models.

For collaboration, Productive.io offers real-time document collaboration with AI-powered features, enabling efficient teamwork. 

Accelo, in contrast, integrates deeply with  client management. It offers automated project triggers and notifications that enhance client interactions and streamline project updates.

If your agency needs flexible project management and detailed financial tracking, Productive.io is likely the better fit. 

But if you’re a service-based agency needing robust client management tools and smart scheduling, especially for ongoing client work, Accelo might be the stronger choice.

Final Thoughts

In conclusion, Productive.io is a strong choice for agencies needing a flexible, feature-rich management platform. It offers tools for managing complex projects, financial tracking, and team collaboration, with varied pricing tiers to suit agencies of all sizes. 

Whether you need essential tools for a small team or full customization for a large organization, Productive.io has a plan that fits. However, alternatives like Agency Handy or Scoro might be worth exploring if your agency has simpler needs or a tighter budget. 

Ultimately, the best platform depends on your agency’s specific needs, budget, and long-term goals. Evaluate each option to find the best fit for your business.

FAQs

Does Productive.io offer discounts for education, nonprofits, or charities?

Yes, Productive.io supports education and nonprofit sectors by offering free accounts to teachers and students. Nonprofits and charities can also receive a 50% discount on all subscriptions. Contact us for more details.

Is Productive.io right for you?

Productive.io is ideal for agencies of all sizes needing comprehensive tools for managing tasks, resources, finances, and client interactions. It’s especially suited for those handling complex operations that require detailed reporting and customizable workflows.

Does Productive.io offer discounts?

Productive.io doesn’t offer specific discounts, but you can save by opting for their annual billing plan, which is more cost-effective than paying monthly.

Is Productive.io good for small businesses?

Yes, Productive.io is a solid choice for small businesses needing robust project management and financial tracking tools. The Essential, priced at $9 per user per month (billed annually),  offers key features at an affordable price, though other platforms may meet simpler needs.

Namira Taif
Written by

Namira Taif

Related Posts

Productized Service Software: Definition, Benefits, Top Software & More

by Mohammod Munir

Subscription Management Software: A Complete Guide & Tool Comparison in 2026

by Mohammod Munir

Best Client Management Software: A Complete Guide for Agencies in 2026

by Mohammod Munir

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.